Planning leads for solar and renewables installers in Worcestershire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Worcestershire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Wychavon 28 in 90 days
- Malvern Hills 14 in 90 days
- Wyre Forest 7 in 90 days
- Bromsgrove and Redditch 5 in 90 days
- Worcester 5 in 90 days
Jobs on the register in Worcestershire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Proposed new photovoltaic panels to east and west elevations.
- Electric vehicle charging hub, associated parking, ancillary structures and associated works.
- Installation of 2 air source heat pumps and 5 air conditioning condenser units, within acoustic enclosures, to rear elevation of existing commercial building and associated installation of 4 square s…
- (CONSULTATION COMMENTS SHOULD BE MADE DIRECTLY TO ARROW VALLEY SOLAR ON THEIR WEBSITE https://arrowvalleysolar.co.uk/) Pre-application stage (prior to Development Consent Order) consultation relating…
- Removal of existing charging bay and creation of EV charging zones, erection of jet wash bays, canopy, valeting bays, sub-station enclosure, LV panel, meter cabinet, plant room and associated works.
- 8 no. 'arena2k' solar-powered lighting around the existing horse arena (Retrospective)
- Installation of five external condenser units forming part of reversible air-source heat-pump systems providing heating and cooling to the existing nursery activity and sleeping areas, together with …
- Proposed new garage outbuilding with home office, gym and storage above. Installation of solar PV panels.
- Proposed internal and external alterations to facilitate the change of use of the premises to form a commercial unit (Class E) in the north half of the ground floor and one self-contained unit of res…
- Proposed change of use and external alterations to form a commercial unit (Class E) in the north half of the ground floor and one self-contained unit of residential accommodation in the remainder, in…
- Proposed solar panel array installed on garage roof
- Installation of photovoltaic (PV) solar panels on the west-facing roof slope of the Grade II listed building
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Worcestershire: planning leads in Worcestershire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.