Planning leads for solar and renewables installers in Kent
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Kent. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Tonbridge and Malling 26 in 90 days
- Ashford 22 in 90 days
- Tunbridge Wells 21 in 90 days
- Folkestone & Hythe 16 in 90 days
- Medway 15 in 90 days
- Dover 14 in 90 days
- Sevenoaks 10 in 90 days
- Dartford 9 in 90 days
- Swale 9 in 90 days
- Canterbury 6 in 90 days
- Maidstone 4 in 90 days
- Gravesham 3 in 90 days
Jobs on the register in Kent
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Replacement of front door and installation of solar panels to south-east elevation of the main dwelling and to the south-east and north-west elevations of the existing detached garage.
- Lawful Development (proposed): Solar panels
- Details of Condition 8 (Construction Method Statement) 9 (Sustainable Surface Water Drainage Scheme)12 (External Materials) 20 (Contamination Discovery Strategy) 21 (Foundation Works Risk Assessment)…
- EIA Screening Request - Proposed Solar PV and BESS Development on Land Northeast of Pound Lane, Brabourne Lees,
- LBC: roof mounted solar panels to rear outbuilding
- Roof mounted solar panels to rear outbuilding
- Raising of roof height to facilitate a loft conversion in the roof space to provide additional accommodation; construction of a dormer to front Juliet balcony to side and installation of roof lights …
- Relocation of existing charity bins, creation of an EV charging zone with canopy, construction of covered jet wash bays, sub-station enclosure, LV panel, meter cabinet, plant room and associated works
- Demolition of existing garage and front gate. Erection of 1 bedroom dwelling with associated parking, bin storage and landscaping. Installation of solar panels.
- Determination as to whether the prior approval of the Local Planning Authority is required under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) (England…
- Change of use of agricultural land to allow the installation of 25no ground mounted solar panels to serve the residential dwelling.
- Prior approval for the installation of solar equipment on Non-domestic premises under Class J of Part 14 of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 (GPD…
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
- Norfolk 123 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Kent: planning leads in Kent.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.