Planning leads for solar and renewables installers in Wales
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Wales. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Powys 25 in 90 days
- Vale of Glamorgan 17 in 90 days
- Carmarthenshire 12 in 90 days
- Monmouthshire 12 in 90 days
- Isle of Anglesey 11 in 90 days
- Bridgend 9 in 90 days
- Wrexham 9 in 90 days
- Cardiff 8 in 90 days
- Rhondda Cynon Taf 8 in 90 days
- Torfaen 6 in 90 days
- Flintshire 5 in 90 days
- Neath & Port Talbot 5 in 90 days
Jobs on the register in Wales
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Planning application for change of use from Class C3b to Class C2 along with various changes including the installation of ASHP, PV panels, external amenity area and re-configuration of car parking a…
- Installation of Solar PV panels facing the highway road.
- Installation of Solar Photovoltaic (PV) Panels.
- Localised landscaping to land to the north of Capel Y Groes, to include the provision of a storage container with solar PV and ASHP/bin enclosure
- Installation of a 43 kWproof mounted Solar Photovoltaic (PV) system on the existing roof of the building. Works include the installation of PV panels mounted on to the roof, together with associated …
- installation of air source heat pump to front of property
- The construction of a concrete base approximately 760mm x 740mm x 20mm protruding above ground for the mounting of a dedicated Solar PV enclosure
- INSTALLATION OF SOLAR PANELS TO ROOF, REPLACEMENT OF EXISTING FRONT DOOR AND CONSTRUCTION OF STONE CLADDING TO EXISTING BOUNDARY WALL
- Installing an outside tap in the breeze block wall of the attached barn next to the EV charging point. The tap will connect through the breeze block wall from the existing water pipe in the attached …
- Screening opinion under Regulation 6 of the Town & County Planning (Environmental Impact Assessment) (Wales) Regulations 2017 for a proposed solar farm development
- Proposed alterations to car park to provide canopy, EV charging zone, jet wash bays and valet bays and associated works including sub-station enclosure, LV panel, meter cabinet and plant room
- Installation of ground mounted PV array with associated works
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Norfolk 123 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Wales: planning leads in Wales.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.