Planning leads for solar and renewables installers in Norfolk
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Norfolk. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- South Norfolk 44 in 90 days
- North Norfolk 32 in 90 days
- Broadland 21 in 90 days
- King's Lynn and West Norfolk 15 in 90 days
- Norwich 6 in 90 days
- Great Yarmouth 5 in 90 days
Jobs on the register in Norfolk
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Removal of existing single storey extensions and erection of side and rear single storey extensions including solar panels, replacement of water tank and minor exterior alterations
- Installation of solar panels on south facing roof slope of dwelling
- Insallation of freestanding EV Charger on an upstand
- Details of condition 3 (Solar panels) of existing application 2026/1159
- Energy efficiency improvements including the installation of 4no.solar panels, DMEV units and roof vents.
- Demolition of existing outbuildings. New extension to house replacing existing, with air source heat pump. Two new ancillary agricultural style buildings
- Details of condition 7 (Installation of an Air Source heat Pump) of original planning application 20230020 dated 01/08/2025
- Single storey rear extension including rooflights and roof-mounted solar panels
- Installation of 8 x Jinko Tiger Neo 455W Dual Glass All Black N-Type Mono solar panels
- Installation of 8 x Jinko Tiger Neo 455W Dual Glass All Black N-Type Mono solar panels
- Installation and operation of solar panels fixed to metal frames to provide electricity - THIS APPLICATION WILL BE DETERMINED BY NORFOLK COUNTY COUNCIL - FUL/2026/0029
- Installation of a ground mounted solar array
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Norfolk: planning leads in Norfolk.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.