Planning leads for solar and renewables installers in Scotland
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Scotland. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Dumfries and Galloway 52 in 90 days
- Perth and Kinross 42 in 90 days
- Fife 37 in 90 days
- Edinburgh 26 in 90 days
- Argyll and Bute 19 in 90 days
- Glasgow 17 in 90 days
- Orkney Islands 16 in 90 days
- Angus 12 in 90 days
- Moray 12 in 90 days
- Western Isles 12 in 90 days
- Aberdeenshire 11 in 90 days
- Stirling 8 in 90 days
Jobs on the register in Scotland
Newest first, from the councils' own registers. We never publish who applied or where they live.
- INSTALLATION OF AN AIR SOURCE HEAT PUMP TO THE EAST ELEVATION OF DWELLINGHOUSE
- ERECTION OF DWELLINGHOUSE AND DETACHED DOMESTIC GARAGE WITH ROOF MOUNTED SOLAR PANELS, INSTALLATION OF AN AIR SOURCE HEAT PUMP, SEPTIC TANK AND SOAKAWAY AND FORMATION OF ACCESS ROAD
- Installation of solar panels
- ERECTION OF SINGLE STOREY EXTENSION TO SOUTH ELEVATION OF DWELLINGHOUSE AND INSTALLATION OF AN AIR SOURCE HEAT PUMP
- Prior Notification for Farm-related Building Works - Solar greenhouse
- Installation of one air source heat pump, ground-mounted on an independent base. Including, service pipework passing through a limited wall penetration.
- Installation of Solar Array
- Installation of solar photo voltaic array to roof, ground mounted ASHP and battery storage unit
- Alterations to dwellinghouse, installation of solar panels, air source heat pump and inverter
- ALTERATIONS INCLUDING INSTALLATION OF REPLACEMENT FRONT DOOR, ERECTION OF EXTENSION TO REAR ELEVATION OF DWELLINGHOUSE, ERECTION OF DETACHED DOMESTIC GARAGE/WORKSHOP WITH ROOF MOUNTED SOLAR PANELS, F…
- CONVERSION OF 6 NO. SHIPPING CONTAINERS WITH ROOF MOUNTED SOLAR PANELS TO FORM AN EXTENSION TO A NHS FACILITY, FORMATION OF CAR PARKING AREA WITH ELECTRIC VEHICAL CHARGING POINTS, ERECTION OF RETAINI…
- Re-locate the solar panel array (approved in planning approval 25/00061/FUL) with associated works and builds
Where else this work is
- London 526 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
- Norfolk 123 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Scotland: planning leads in Scotland.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.