Planning leads for solar and renewables installers in West Yorkshire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in West Yorkshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Leeds 45 in 90 days
- Kirklees 32 in 90 days
- Wakefield 25 in 90 days
- Bradford 16 in 90 days
- Calderdale 3 in 90 days
Jobs on the register in West Yorkshire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Removal of existing side extension and dormer and erection of single storey wrap around extension and first floor extension, including conversion of garage to habitable accommodation, erection of det…
- Installation of roof mounted 101.2kW solar PV system comprising of 220 x Canadian Solar 460w modules. Solar panel modules have 2mm heat strengthened glass front cover with anti-reflective coating to …
- Installation of an Air Source Heat Pump
- Installation of a 133.22kW Solar PV system on two roofs on the building
- Adding solar panels to an existing south facing roof in a conservation area
- Installation of roof-mounted solar photovoltaic (PV) panels
- Installation of air source heat pump to rear (east) elevation of dwelling
- Change of use and alterations to convert existing redundant building into self-storage units and offices including installation of roof-mounted solar panels and associated works
- Listed Building Consent for installation of solar panels to the roofs of mill buildings, units 18, 19, 20, 21, 51 and 52 (within a Conservation Area)
- Installation of solar panels to the roofs of mill buildings, units 18, 19, 20, 21, 51 and 52 (Listed Building, within a Conservation Area)
- Listed Building Consent for installation of untethered electric vehicle charger
- Installation of untethered electric vehicle charger (Listed Building)
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in West Yorkshire: planning leads in West Yorkshire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.