Planning leads for solar and renewables installers in Warwickshire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Warwickshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Stratford-on-Avon 24 in 90 days
- Warwick 11 in 90 days
- Rugby 4 in 90 days
Jobs on the register in Warwickshire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Addition of two pitch roof dormers to the rear, addition of an air-source heat pump, replacement ...
- Partial demolition of the existing boundary wall and formation of an off-street parking area and vehicular access, including associated dropped kerb and footway works, landscaping and electric vehicl…
- Installation of solar photovoltaic panels
- Installation of 20 PV solar panels on the roof of the annexe at The Grange Stables
- Change of use of agricultural land to allow installation of a ground-mounted solar photovoltaic system comprising 15 panels arranged in two arrays of eight and seven panels, together with associated …
- installation of a 54.15kw Ground Mounted Solar Array and associated works (retrospective)
- Double-storey side extension, single-storey rear extension and porch extension with solar panels.
- Installation of a 12 panel solar pv system to the roof pitches of detached garage to rear of main...
- Installation of a 12no. panel solar pv system to the roof pitches of detached garage to rear of m...
- Installation of Air Source Heat Pump
- Removal of oil-fired boiler and oil storage tank, and installation of Air Source Heat Pump
- Retrospective installation of three air source heat pumps to the side elevation, and associated a...
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Warwickshire: planning leads in Warwickshire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.