Just Granted

Planning leads for solar and renewables installers in Tyne and Wear

We cover 4 of the 5 planning authorities in Tyne and Wear, and everything below is counted from those. Measured

A flat illustration of a pitched roof carrying three solar panels under a plain sun.
26 applications in Tyne and Wear in the last 90 days Measured
4 councils they came from
4,329 across the whole country, same search

Counted on 17 October 2026, and recounted every week. Measured

Applications a week for the last 12 weeks — busiest week 4. Measured
Week of 27 Jul 2026 — 1 application Week of 3 Aug 2026 — 1 application Week of 10 Aug 2026 — 0 applications Week of 17 Aug 2026 — 0 applications Week of 24 Aug 2026 — 0 applications Week of 31 Aug 2026 — 1 application Week of 7 Sep 2026 — 1 application Week of 14 Sep 2026 — 4 applications Week of 21 Sep 2026 — 2 applications Week of 28 Sep 2026 — 1 application Week of 5 Oct 2026 — 1 application Week of 12 Oct 2026 — 0 applications

27 Jul 2026 12 Oct 2026

Use this search

One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.

Solar and renewables installers in Tyne and Wear. It comes with the free account and with the £39 plan; there is nothing extra to buy.

Jobs on the register in Tyne and Wear

Newest first, from the councils' own registers. We never publish who applied or where they live.

  • Replacement of existing rear extensions, replacement and alteration of main roof to facilitate a loft conversion. Installation of rooflights and solar PV panels, replacement of front bay window/porch… Awaiting decision North Tyneside Received 9 Oct 2026
  • Ashcroft Electrical services are proposing to install a 218kw solar PV roof mounted system Awaiting decision North Tyneside Received 23 Sep 2026
  • Installation and operation of a new 169.26 kWp roof mounted solar PV system. Awaiting decision Sunderland Received 20 Sep 2026
  • Installation and operation of a 234.78 kWp roof mounted solar PV system. Awaiting decision Sunderland Received 20 Sep 2026
  • Loft conversion including erection of a rear dormer, installation of roof lights and solar panels to the front, with a new roof finish to the front and rear Awaiting decision North Tyneside Received 18 Sep 2026
  • Installation of rooftop air source heat pumps, thermal storage vessels, associated plant, pipework, support structures, access infrastructure and roof access door in connection with the decarbonisati… Awaiting decision North Tyneside Received 14 Sep 2026
  • Installation of air source heat pump Awaiting decision Sunderland Received 10 Sep 2026
  • Provide solar reflective window film to the ground floor windows on the south west and north west facing elevations to office 1 to reduce solar heat gain during the summer months Awaiting decision North Tyneside Received 2 Sep 2026
  • Erection of air source heat pumps, erection of new store plant equipment and associated works. Approved Sunderland Received 6 Aug 2026
  • Erection of a single-storey detached garage with pitched tiled roof and render finish, conversion of the existing attached garage into habitable kitchen space, including replacement of garage door wi… Approved Sunderland Received 27 Jul 2026

What it costs

A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.