Planning leads for solar and renewables installers in Nottinghamshire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Nottinghamshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Rushcliffe 24 in 90 days
- Newark and Sherwood 17 in 90 days
- Nottingham 11 in 90 days
- Ashfield 8 in 90 days
- Bassetlaw 7 in 90 days
- Broxtowe 5 in 90 days
- Mansfield 5 in 90 days
- Gedling 3 in 90 days
Jobs on the register in Nottinghamshire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Prior Approval for proposed installation of solar panels (up to 108) on flat roof of buidling
- Remodelled dwelling including first floor and single storey rear extensions, raising of ridge and eaves height. Alteration to fenestration. Air source heat pump, solar panels to front roof. Applicati…
- Remodel of existing dwelling includes the erection of a single-storey side and rear extension, increase in ridge height to facilitate first-floor accommodation, and erection of a front porch. Applica…
- Remove front elevation dormer and install new flat roof dormer. Install new and enlarged rooflights on the front elevation. Erect greenhouse/shed to rear. New solar panels to dormer roof.
- Installation of Two separate Low-Profile Ballast-Loaded Solar Photovoltaic (PV) systems with Associated Electrical Infrastructure on the Roof Areas of 83, 83a and 87 Bridge Street.
- Consultation request, updates and information for Great North Road Solar and Biodiversity Park. For further details, please follow link; https://national-infrastructure-consenting.planninginspectorat…
- Installation of Two separate Low-Profile Ballast-Loaded Solar Photovoltaic (PV) systems with Associated Electrical Infrastructure on the Roof Areas of 83, 83a and 87 Bridge Street.
- Demolition of conservatory, lean-to and outbuilding sheds. Tree removal, proposed rear extension, installation of solar panels and an ASHP, alterations to fenestration
- Installation of 407kw solar PV roof mounted system
- Prior Approval Application for the installation of a 440 kw solar PV roof mounted system at the existing Morrisons Foodstore
- THE INSTALLATION OF AN AIR SOURCE HEAT PUMP SYSTEM WITH A THERMAL STORE LOCATED ADJACENT TO THE PLANT ROOM TO REPLACE THE EXISTING CARBON BASED HEAT NETWORK.
- Construct single storey rear and side extension to main dwelling. Construct first floor over existing detached garage and extend to rear. Install air-conditioning unit or air source heat pump.
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Nottinghamshire: planning leads in Nottinghamshire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.