Planning leads for solar and renewables installers in Northern Ireland
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Northern Ireland. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Armagh City, Banbridge and Craigavon 12 in 90 days
- Belfast 12 in 90 days
- Antrim and Newtownabbey 10 in 90 days
- Mid Ulster 9 in 90 days
- Mid and East Antrim 8 in 90 days
- Ards and North Down 7 in 90 days
- Causeway Coast and Glens 7 in 90 days
- Lisburn and Castlereagh 6 in 90 days
- Newry, Mourne and Down 5 in 90 days
- Derry City and Strabane 1 in 90 days
- Fermanagh and Omagh 1 in 90 days
Jobs on the register in Northern Ireland
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Proposed single storey extension & installation of solar panels to existing dwelling.
- Installation of photovoltaic panels to church hall
- Installation of photovoltaic panels to church hall
- Proposed new broiler site for up to 64k broiler hens, new ancillary building, general purpose storage building, meal silos, retaining wall, swale for storm water attenuation, concrete apron for deliv…
- Proposed disabled entrance door and associated disabled access ramp (to unit No 1) and the provision of solar panels on the front and rear elevations to serve the total apartment block (Nos 1 to 16) …
- 2no. replacement dwellings and alterations to existing dwelling to provide ancillary office associated with Bryansford Caravan Park, car parking, landscaping, roof-mounted solar panels, use of approv…
- Proposed broiler units for up to 80k birds in total, new access onto Knockcairn Road, new access laneway. Ancillary building, general purpose storge shed, concrete apron for deliveries and collection…
- Proposed Erection of a Free Range Poultry Shed with 2No. Feed Bins, a Storage Shed, Roof-Mounted PV Panels and all associated Site Works (Poultry Shed to contain 16,000 Free Range Egg Laying Hens)
- Proposed new free range poultry unit for up to 15k free range laying hens, new litter store, swale for store water attentuation, meal silos, egg packing room, pv panels to roof of poultry unit, retai…
- Proposed roof mounted PV panel installation and internal alterations to include installation of secondary glazing to existing windows
- Demolition of existing sales office building and erection of a new building to include a sales office, showroom and commercial garage/workshop with roof mounted solar panels and an extension to the e…
- Refurbishment of hall (continuance of use within Class D2 for use as a cinema / dance / concert hall / theatre) to include a bar and the addition of roof solar panels and alterations to the entrance …
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Northern Ireland: planning leads in Northern Ireland.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.