Planning leads for solar and renewables installers in Northamptonshire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Northamptonshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- West Northamptonshire 28 in 90 days
- North Northamptonshire 4 in 90 days
Jobs on the register in Northamptonshire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Installation of photovoltaic solar panels to the south-east facing roof of main dwellinghouse and attached garage. Black photovoltaic panels on rails fixed to existing roof structure. The installatio…
- Installation of 16 inset photovoltaic solar panels on the south-facing roof slope, together with an inverter, battery storage and associated cabling
- Determination as to whether prior approval is required (under Schedule 2, Part 14, Class J of the above Order) for installation of 111KWp roof mounted solar system
- To determine if prior approval required [under Schedule 2, Part 14, Class J of the above order] for the Installation of a 383.5kw solar PV roof mounted system
- Installation of electric vehicle charger to external wall of garage.
- Lawful development certificate (proposed) for works include the installation of EV charging posts, a substation, associated electrical works and cabling, as well as improved paving and line marking. …
- Determination as to whether prior approval is required (under Schedule 2, Part 14, Class J of the above Order) for installation of a roof-mounted photovoltaic (PV) array.
- Prior approval [Under Schedule 2, Part 14, Class J of the GPDO] for the installation of a PV array on the roof of an existing warehouse at Apex Park.
- Application for Planning Permission and Listed Building Consent for Roof Works incl Replacement Felt, Fall Arrest System and Roof Mounted Photovoltaic Array.
- Roof Works incl Replacement Felt, Fall Arrest System and Roof Mounted Photovoltaic Array.
- Determination as to whether prior approval is required (under Schedule 2, Part 14, Class A of the above Order) for the installation of solar PV on the roof area.
- Erection of detached workshop and double garage with first-floor storage and roof-mounted solar panels, ancillary to the existing dwellinghouse.
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Northamptonshire: planning leads in Northamptonshire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.