Planning leads for solar and renewables installers in Hampshire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Hampshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Test Valley 27 in 90 days
- Basingstoke and Deane 25 in 90 days
- New Forest 20 in 90 days
- Winchester 15 in 90 days
- Rushmoor 10 in 90 days
- Eastleigh 4 in 90 days
- Hart 4 in 90 days
- Southampton 3 in 90 days
- Gosport 2 in 90 days
- Havant 1 in 90 days
Jobs on the register in Hampshire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Application to determine if prior approval is required for a proposed installation of photovoltaic (PV) solar panels to the roof of a non-domestic building
- Installation of a roof-mounted solar photovoltaic (PV) system (173 PV Panels)
- Addition of an additional residential Heat Pump. [Case Officer: Donna Toms. Ref: 26/02008/FULMAJ] PLEASE NOTE THE DECISION ON THIS APPLICATION IS MADE BY WEST BERKSHIRE DISTRICT COUNCIL
- Rear extension, raise garage roof and replacement solar panels
- Installation of Air Heat Pump system (retrospective)
- Installation of electric vehicle (EV) chargers, delineated parking, inclusion of disabled EV parking bays, feeder pillars, and associated infrastructure
- Installation of electric vehicle (EV) chargers, delineated parking, inclusion of disabled and long vehicle EV parking bays, feeder pillars, and associated infrastructure
- Installation of 5 no. ground-mounted air source heat pump units and construction of secure fenced compound and ancillary works
- Industrial unit with solar panels on roof and open storage on site (B2/B8 and E(g)(i)); demolitio...
- Installation of a swimming pool, patio area, shed/plant room and air source heat pump
- Application for a certificate of lawful development for a proposed installation of a single domestic air source heat pump (ASHP) outdoor compressor unit to be located on the side elevation at ground-…
- Replacement of oil-fired boiler with two Air Source Heat Pump units with associated bases and routing of pipework and electrical cabling, installation of battery energy storage units, installation of…
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Hampshire: planning leads in Hampshire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.