Planning leads for solar and renewables installers in Greater Manchester
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Greater Manchester. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
Jobs on the register in Greater Manchester
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Prior approval for proposed installation of solar PV panels to roof
- Change of use to mixed-use entertainment venue comprising cinema, restaurant and bar, theatre and live music venue, including ancillary food and beverage sales and bar use (sui generis) with associat…
- INSTALLATION OF 2NO. BATTERY STORAGE UNITS
- Demolition of existing garage and erection of a single-storey side extension and the installation of solar panels to rear roof elevation.
- External alterations including thermal over-cladding of building, guard rail to the roof, installation of solar panels and air source heat pumps, and new refuse store.
- Installation of a a low profile solar panel array on an unused paddock at the trop of the site, to generate low carbon electricity for the site / residential owners
- External alterations including thermal over-cladding of building, guard rail to the roof, and installation of solar panels and air source heat pumps.
- PRIOR APPROVAL FOR THE INSTALLATION OF SOLAR PANELS TO THE ROOF OF BUILDING
- Re-grading of site and erection of 4no. semi-detached dwellings, air source heat pumps, amended site access onto Grange Road and associated landscaping and boundary treatments.
- Installation of air source heat pump to rear of property
- Installation of 465.5kw solar PV roof mounted system.
- Application for installation of 300 No. roof mounted solar panel array to provide 131. Kwp power generation (determination as to whether prior approval is required under Schedule 2 Part 14 Class J of…
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Greater Manchester: planning leads in Greater Manchester.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.