Planning leads for solar and renewables installers in Essex
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Essex. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Southend on Sea 16 in 90 days
- Maldon 13 in 90 days
- Chelmsford 12 in 90 days
- Epping Forest 10 in 90 days
- Basildon 8 in 90 days
- Thurrock 5 in 90 days
- Rochford 4 in 90 days
- Tendring 4 in 90 days
- Uttlesford 4 in 90 days
- Brentwood 2 in 90 days
- Castle Point 2 in 90 days
- Harlow 2 in 90 days
Jobs on the register in Essex
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Raise ridge to form habitable accommodation in loftspace with dormer to rear and rooflights to front, install solar PV panels to roof, demolish conservatory, erect single storey rear extension, alter…
- Installation of air source heat pump to rear of property.
- Change of use to first floor from offices (Class E) to 7-bed HMO (Sui-Generis), install roof terrace, solar PV panels, alter fenestration, alter east elevation, layout cycle and refuse storage
- Demolition of existing residential outbuildings. Erection of 1 no. four bedroom detached dwelling with associated parking, new vehicle access and air source heat pump.
- Householder Planning Application - single storey rear extension (following removal of rear conservatory) and solar panels to rear roof slope
- Demolish conservatory, single storey rear extension, alter elevations, remove rear chimney stack, install detached outbuilding and heat pump to rear garden (Lawful Certificate Development - Proposed)
- Installation of an external air source heat pump to the rear garden of the property
- Layout raised patio, replace existing storage sheds, install new bin, bike and garden storage, install new EV charger and outdoor socket, install motion sensored LED uplighters and relay block paving…
- Install dormer to rear and solar panels to rear roof slopes
- Application for Lawful Development Certificate for Proposed Use or Development for installation of 466 solar panels to the roof of a non domestic building/premises
- Installation of an external, wall-mounted air source heat pump.
- Install 1422no. monocrystalline silicon solar photo-voltaic modules over pitched roof (Prior Approval)
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Essex: planning leads in Essex.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.