Planning leads for solar and renewables installers in East Sussex
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in East Sussex. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Wealden 19 in 90 days
- Hastings 6 in 90 days
- Lewes 5 in 90 days
- Eastbourne 2 in 90 days
Jobs on the register in East Sussex
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Installation of air source heat pump to side elevation
- INSTALLATION OF AN AIR SOURCE HEAT PUMP (AIR CONDITIONING) OUTDOOR UNIT WITH PROTECTIVE CAGE GUARD ON THE REAR (EAST) ELEVATION, SERVING THREE INTERNAL WALL-MOUNTED UNITS.
- PROPOSED NEW SWIMMING POOL AND ASSOCIATED AIR SOURCE HEAT PUMP AND PLANT
- RENOVATION OF EXISTING ROOF INCLUDING REPLACEMENT ROOF TILES, SOFFITS, FASCIAS AND VERTICAL HANGING TILES, REMOVAL OF REDUNDANT CHIMNEY STACK AND INSTALLATION OF RECESSED/IN-ROOF SOLAR SYSTEM.
- INSTALLATION OF ONE GROUND-MOUNTED SOLAR PHOTOVOLTAIC ARRAY COMPRISING 20 NO. PORTRAIT-ORIENTED PANELS IN A SINGLE ROW (MAXIMUM OVERALL DIMENSIONS 23.4 METRES LONG, 2.1 METRES DEEP AND 2.0 METRES HIG…
- Prior Notification Under The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) - Schedule 2, Part 14, Class J for the installation of solar equipment across …
- Installation of 2no. electric vehicle recharging upstands with 1no. associated feeder pillar, and...
- INTERNAL AND EXTERNAL ALTERATIONS INCLUDING REPLACEMENT AND ALTERATION OF MODERN WINDOWS AND DOORS, REMOVAL OF PORCH, REMOVAL OF STAIRCASE, EXTENSION OF KITCHEN, RE-EXPOSURE OF CHIMNEY STACK, LOWERIN…
- INTERNAL AND EXTERNAL ALTERATIONS INCLUDING REPLACEMENT AND ALTERATION OF MODERN WINDOWS AND DOORS, REMOVAL OF PORCH, REMOVAL OF STAIRCASE, EXTENSION OF KITCHEN, RE-EXPOSURE OF CHIMNEY STACK, LOWERIN…
- Installation of an electric vehicle charger on a post in front of small front wall to driveway.
- INSTALLATION OF ADDITIONAL GROUND MOUNTED SOLAR PANELS WITHIN THE REAR OF THE GROUNDS.
- Two-storey outbuilding for use as an art studio; to include roof lights and solar panels
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in East Sussex: planning leads in East Sussex.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.