Just Granted

Planning leads for solar and renewables installers in Derbyshire

We cover 9 of the 9 planning authorities in Derbyshire, and everything below is counted from those. Measured

A flat illustration of a pitched roof carrying three solar panels under a plain sun.
50 applications in Derbyshire in the last 90 days Measured
9 councils they came from
4,329 across the whole country, same search

Counted on 17 October 2026, and recounted every week. Measured

Applications a week for the last 12 weeks — busiest week 4. Measured
Week of 27 Jul 2026 — 1 application Week of 3 Aug 2026 — 3 applications Week of 10 Aug 2026 — 4 applications Week of 17 Aug 2026 — 2 applications Week of 24 Aug 2026 — 3 applications Week of 31 Aug 2026 — 3 applications Week of 7 Sep 2026 — 1 application Week of 14 Sep 2026 — 2 applications Week of 21 Sep 2026 — 2 applications Week of 28 Sep 2026 — 4 applications Week of 5 Oct 2026 — 1 application Week of 12 Oct 2026 — 0 applications

27 Jul 2026 12 Oct 2026

Use this search

One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.

Solar and renewables installers in Derbyshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.

Jobs on the register in Derbyshire

Newest first, from the councils' own registers. We never publish who applied or where they live.

  • Listed Building Consent for the installation of an EV charger on the front right porch area of the building. Awaiting decision High Peak Received 30 Sep 2026
  • Installation of electric vehicle (EV) chargers, delineated parking, inclusion of disabled and long vehicle EV parking bays, feeder pillars, and associated infrastructure Awaiting decision Bolsover Received 29 Sep 2026
  • Installation of electric vehicle (EV) chargers, delineated parking, inclusion of disabled and long vehicle EV parking bays, feeder pillars, and associated infrastructure Awaiting decision Bolsover Received 29 Sep 2026
  • Listed Building Consent for the installation of a ground-mounted solar PV array (50no. panels) with associated battery storage and inverter equipment, and replacement of an existing electric vehicle … Awaiting decision South Derbyshire Received 29 Sep 2026
  • The change of use of one of the existing outbuildings into an office, external alterations to both outbuildings, works of hard and soft landscaping, the creation of a bat loft and installation of PV … Awaiting decision North East Derbyshire Received 24 Sep 2026
  • To install a 451.5kw solar PV roof mounted system Awaiting decision Chesterfield Received 23 Sep 2026
  • Buxton Ambulance Station for EMAS Full refurbishment works to existing ambulance station to include, alteration works internally, new roof, refurbishment works to external fabric and PV panels to the… Awaiting decision High Peak Received 18 Sep 2026
  • The erection of a single storey rear extension to the main dwelling, a side extension to the garden room/out building to form an annexe, installation of solar panels and replacement of windows and do… Awaiting decision South Derbyshire Received 14 Sep 2026
  • The demolition and partial demolition of agricultural buildings and the change of use of the retained part from agriculture to the siting of a battery storage facility and an electricity sub station. Awaiting decision High Peak Received 11 Sep 2026
  • EIA Screening Opinion for Newton Solney Solar Farm Awaiting decision South Derbyshire Received 4 Sep 2026
  • Installation of a ground-mounted solar PV array (50no. panels) with associated battery storage and inverter equipment, and replacement of an existing electric vehicle charge point with a higher-capac… Awaiting decision South Derbyshire Received 2 Sep 2026
  • Erection of Ground Mounted Solar Panel Array Awaiting decision North East Derbyshire Received 24 Aug 2026

What it costs

A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.