Planning leads for solar and renewables installers in Cheshire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Cheshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Cheshire West and Chester 29 in 90 days
- Halton 8 in 90 days
Jobs on the register in Cheshire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Installation of roof-mounted solar photovoltaic panels
- Retrospective planning application for the installation of roof mounted solar panels on a non-domestic premises at
- Single storey rear extension to replace existing conservatory, removal of existing porch and replacement with open porch, conversion of existing garage into workshop and utility, replacement of exist…
- Proposed installation of 11 no. solar panels onto the high-level 'Cuerdley Chapel' and 'Chancel' roof, 6 no. to be installed onto the East-facing 'Cuerdley Chapel' roof and 11 no. installed to the So…
- Single storey side extension, porch extension and solar panels to rear roof
- Proposed single-storey infill extension, single-storey side extension and porch, with associated alterations to elevations, including rooflights and roof-mounted solar panels
- Replacement dwelling with attached car port, installation of new entrance gates, solar panels, and heat pumps.
- Demolition of the existing garage to the side of the property and construction of a new single-storey side kitchen/lounge extension. Installation of solar PV panels on the new flat roof.
- Part demolition of existing Fire Station. Single storey extension, erection of substation, installation of solar panels, and alterations to remaining site including installation of security fencing,
- Installation of a roof-mounted solar photovoltaic (PV) system.
- Application to determine if prior approval is required for the installation of 26 solar panels at
- Conversion of existing bungalow roof from hipped to gable and rear dormer to create first floor, rooflights to front, removal of chimney stack, alterations to windows and doors, rendering finish, rem…
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Cheshire: planning leads in Cheshire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.