Planning leads for solar and renewables installers in Cambridgeshire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Cambridgeshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- South Cambridgeshire 57 in 90 days
- Cambridge 45 in 90 days
- Huntingdonshire 22 in 90 days
- East Cambridgeshire 16 in 90 days
- Fenland 7 in 90 days
- Peterborough 7 in 90 days
Jobs on the register in Cambridgeshire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Installation of air source heat pump to side (west) elevation of dwelling.
- Installation of air source heat pump to side (west) elevation of dwelling.
- Installation of a wall-mounted electric vehicle charger with associated timber c
- Installation of a wall-mounted electric vehicle charger with associated timber c
- Installation of air source heat pumps and solar panels
- Change of roofing materials incorporating inlaid photovoltaic panels to rear slope and replacement roof window glazing to rear and side
- Installation of a 230 kWp solar canopy on a car port roof for renewable energy generation and on-site consumption at Raspberry Pi.
- Single-storey rear infill extension and installation of solar panels to the south-east and south-west roof slopes of the existing dwelling.
- Certificate of lawfulness under S192 for installation of heat pump to side elevation.
- Installation of 6 x rapid electric vehicle charging stations and ancillary equipment, and 2 x fully accessible EV charging bays
- To discharge the Biodiversity Net Gain Condition of decision 26/00032/FUL dated 8th June 2026 for erection of stables and associated stores and wash bay. Construction of a fenced outdoor arena with s…
- Part single-storey and part two-storey rear extension, together with alterations to the existing front entrance and installation of an air source heat pump.
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Wales 154 in 90 days
- Norfolk 123 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Cambridgeshire: planning leads in Cambridgeshire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.