Planning leads for solar and renewables installers in Buckinghamshire
Counted on 17 October 2026, and recounted every week. Measured
27 Jul 2026 12 Oct 2026
Use this search
One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.
Solar and renewables installers in Buckinghamshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.
Which councils it is in
- Milton Keynes 24 in 90 days
- Buckinghamshire 6 in 90 days
Jobs on the register in Buckinghamshire
Newest first, from the councils' own registers. We never publish who applied or where they live.
- Certificate of lawfulness for proposed loft conversion with installation of a rear dormer extension with obscure side window and rooflight to the front roof slope. Existing solar photovoltaic panels …
- Retrospective permission for installation of 2x external daikin air to air heat pump compressor units
- Listed building consent for the proposed erection of single storey rear extension, demolition of existing garage and erection of new detached garage and general conservation/maintenance to exterior o…
- Proposed single storey rear extension with the installation of solar panels & a sunpipe and removal of ground floor window on western elevation
- Proposed demolition of an attached greenhouse, erection of a two-storey rear extension and a single-storey side extension, changes to fenestrations, internal and external alterations and new photovol…
- Demolition of existing link building in corner for replacement with new link, door and window structural opening adjustments and replacement of all windows and doors, raising the height of the stone …
- Installation of 2no. air conditioning units and 1no. Air Source Heat Pump unit to existing property
- Prior Approval for the proposed installation of a Solar Photovoltaic (PV) system mounted on the existing metal trapezoidal sheet roof of the building
- Prior approval for the installation of solar photovoltaic (PV) panels on roof with a total system capacity of 365.66kWp
- Development of a new household waste recycling centre (HWRC) with waste and re-use containers, associated engineering and drainage works and vehicular access; solar canopy, parking areas, boundary tr…
- The proposed supply and installation of external condenser units, installation of 3No dual 11kVA EV charging point and the replacement of the existing bike shelter for 20 Space Amazon Eco Two Tier Sh…
Where else this work is
- London 526 in 90 days
- Scotland 341 in 90 days
- Devon 165 in 90 days
- Hertfordshire 163 in 90 days
- Gloucestershire 160 in 90 days
- Kent 158 in 90 days
- Cambridgeshire 154 in 90 days
- Wales 154 in 90 days
Or the national page: Planning leads for solar, heat pump and EV charger installers · everything in Buckinghamshire: planning leads in Buckinghamshire.
What it costs
A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.