Just Granted

Planning leads for solar and renewables installers in Bedfordshire

We cover 3 of the 3 planning authorities in Bedfordshire, and everything below is counted from those. Measured

A flat illustration of a pitched roof carrying three solar panels under a plain sun.
51 applications in Bedfordshire in the last 90 days Measured
3 councils they came from
4,329 across the whole country, same search

Counted on 17 October 2026, and recounted every week. Measured

Applications a week for the last 12 weeks — busiest week 5. Measured
Week of 27 Jul 2026 — 5 applications Week of 3 Aug 2026 — 2 applications Week of 10 Aug 2026 — 1 application Week of 17 Aug 2026 — 2 applications Week of 24 Aug 2026 — 1 application Week of 31 Aug 2026 — 3 applications Week of 7 Sep 2026 — 3 applications Week of 14 Sep 2026 — 2 applications Week of 21 Sep 2026 — 2 applications Week of 28 Sep 2026 — 2 applications Week of 5 Oct 2026 — 1 application Week of 12 Oct 2026 — 0 applications

27 Jul 2026 12 Oct 2026

Use this search

One click puts it on your account. From there it is yours: pick the councils you work in, change the dates, keep only approvals, rename it or throw it away.

Solar and renewables installers in Bedfordshire. It comes with the free account and with the £39 plan; there is nothing extra to buy.

Jobs on the register in Bedfordshire

Newest first, from the councils' own registers. We never publish who applied or where they live.

  • Permission in Principle: For the construction of a self-build dwelling with solar panels and detached car port. Awaiting decision Central Bedfordshire Received 6 Oct 2026
  • Listed Building: Installation of photovoltaic panels to the S/E elevation main dwelling roof and to the S/W elevation garage/barn roof Awaiting decision Central Bedfordshire Received 28 Sep 2026
  • Erection of a single storey rear extension, along with roof mounted solar cells Awaiting decision Central Bedfordshire Received 28 Sep 2026
  • Prior notification for the installation, alteration or replacement on non-domestic properties of (a) micro-generation solar thermal equipment; (b) micro-generation solar PV equipment; or (c) other so… Awaiting decision Bedford Received 24 Sep 2026
  • Removal of existing EV charging bays and the creation of EV charging zones, erection of jet wash bays, valet bays, sub-station enclosure, LV panel, meter cabinet, plant room, floodlights, and associa… Awaiting decision Bedford Received 23 Sep 2026
  • Demolition of two agricultural buildings. Erection of one agricultural building, part single and part two storey with solar panels on the eastern roof slope Awaiting decision Central Bedfordshire Received 18 Sep 2026
  • Installation of 24 ground mounted solar panels Awaiting decision Bedford Received 14 Sep 2026
  • Installation of an Ohme ePod untethered electric vehicle charging point including associated electrical cabling Awaiting decision Bedford Received 10 Sep 2026
  • Construction of a single storey dwelling, with solar panels to the roof, a new access crossover, on site parking and associated landscaping. Awaiting decision Central Bedfordshire Received 8 Sep 2026
  • Conversion of loft and a rear flat roof dormer extension with Juliette balcony, solar panels and rooflights to the front, alterations to external materials and installation of an air source heat pump. Awaiting decision Central Bedfordshire Received 8 Sep 2026
  • Single storey Rear extension, to include installation of solar panels Awaiting decision Bedford Received 4 Sep 2026
  • Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a … Awaiting decision Bedford Received 1 Sep 2026

What it costs

A free account searches every council we cover and posts a letter for £1.45. £39 a month includes 30 letters, then £1.20 each. There is no per-trade and no per-county product.