Just Granted

Planning leads for landscapers and driveway contractors

Hard landscaping is the work that follows a build, and the register tells you when the build was approved. It also carries the jobs that need permission on their own — dropped kerbs, front-garden parking, boundary walls.

4,256 applications matching this search in the last 90 days Measured
308 of the 349 councils we collect had at least one Measured
71 had 20 or more on their own Measured — the number the bar is set on

A trade only gets a page here when the search returns at least 1,000 applications in 90 days and clears 20 in at least 35 separate councils. Two numbers, because one of them lies: solar clears the first on its own and has never once cleared the second, and a page built on the national total alone would promise something that becomes nothing wherever you actually work. Counted on 24 August 2026.

The saved search behind this page

This is not a marketing page with a query hidden behind it. Applying it writes a real saved search onto your account: change the councils, change the date window, change the decision state, rename it or throw it away.

What it filters on: trade=landscapers. Included in the £39 plan and on the free tier — it is not a separate product and there is nothing extra to buy.

Recent applications this search found

Straight from the councils' own registers, newest first. We show what was proposed and what happened to it. We never publish who applied or where they live — that is what an account is for.

  • Proposed garage conversion and access gate within garden wall Awaiting decision Spelthorne Received 21 Aug 2026
  • Erection of a new detached dwelling house (Plot 2) comprising four bedrooms, associated parking, landscaping, in substitution of the dwelling approved under planning permission EPF/1023/23, which has been lawfully comme… Awaiting decision Epping Forest Received 21 Aug 2026
  • Changes to the internal layout and installation of patio doors Awaiting decision Winchester Received 21 Aug 2026
  • Internal layout reconfiguration to create improved family living accommodation, together with external alterations to the rear elevation, including the replacement of the existing patio doors and adjacent window with a … Awaiting decision St Albans Received 21 Aug 2026
  • Remove dead conifer tree located in rear garden on eastern side about 2.8m from boundary wall within Chilbolton Conservation Area Awaiting decision Test Valley Received 21 Aug 2026
  • Lawful Development Certificate for existing use for gates to be open to the public daily from 8am to 6pm Awaiting decision Bournemouth, Christchurch and Poole Received 20 Aug 2026
  • Two storey rear extension and alterations with new access and dropped kerb Awaiting decision Bournemouth, Christchurch and Poole Received 20 Aug 2026
  • Demolition of existing building (comprising 3no. units) and erection of replacement industrial / commercial units, together with the creation of a new vehicular access, associated parking, landscaping and infrastructure Awaiting decision Bournemouth, Christchurch and Poole Received 20 Aug 2026
  • Single storey side and rear extension and alterations to boundary treatment Awaiting decision Rotherham Received 20 Aug 2026
  • Reserved Matters application for the approval of the details of the appearance, landscaping and scale of the site. Awaiting decision Mid Sussex Received 20 Aug 2026
  • Erection of equine storage building, relocation of existing field shelter and installation of concrete hardstanding Awaiting decision North Hertfordshire Received 20 Aug 2026
  • Erection of one detached four-bedroom dwelling and widening of existing vehicular access following demolition of existing garage. Awaiting decision North Hertfordshire Received 20 Aug 2026

That is 12 of 4,256. A free account shows every one of them.

What it costs

A free account searches every council we cover and posts a letter for £1.45. £39 a month puts the applicants' names and addresses in front of you with 30 letters included, then £1.20 each. Trade searches are part of the plan — there is no per-trade product and nothing extra to buy.