Planning applications in Shetland Islands
47
applications in the last 90 days
Measured
30
of them approved
Measured
0
refused
Measured
59 days
typical time from validation to decision
Measured — median of the decisions we hold
8 Jun 2026 24 Aug 2026
Recent planning applications in Shetland Islands
Straight from Shetland Islands Council's public register, newest first. We show what was proposed and what happened to it. We never publish who applied or where they live — that is what an account is for.
- Application for consent, agreement or approval required by planning Condition: 09 (CEMP) of planning application 2024/303/PPF.
- To site a static caravan for residential use (retrospective)
- Application for consent, agreement or approval required by planning Condition: 40 (Shetland Clay Target Club) of planning application 2023/084/VCON
- Works to dormer windows including removal of existing leadwork, replacement of timber sarking and structure with new treated timber, fitting new breather membrane and backing paper with necessary air gaps and fitting ne…
- Application for consent, agreement or approval required by planning Condition: 03 (Otter Survey) of planning application 2026/088/PPF.
- Erection of a replacement 28m high galvanised steel lattice radio mast upon which 7 folded dipole antennas and a sloping long wire antenna will be mounted.
- Application for prior notification under classes 21A, 21B, 21C and 21G of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To modify an existing fish farm by replacing 10…
- To demolish existing entrance porch and erect single storey extension to existing dwellinghouse.
- Application for consent, agreement or approval required by planning Condition: 20 (Surface Water Monitoring) of planning application 2023/084/VCON
- Non Material Variation to vary permission 2024/234/NMV - Install Ventilation & ventilation terminals to roof, ventilation terminals shown on west, north and south elevations and removal of standing seam to lean-to exten…
- Consultation in relation to a Section 36 application under the Electricity Act 1989 for 8 wind turbines with a maximum tip height of 200m, battery energy storage and associated infrastructure at Neshion Energy Park.
- Application for consent, agreement or approval required by planning Condition 5 (Surface Water) of planning application 2025/306/PPF
That is 12 of 47. A free account shows every one of them, filtered how you like.
Nearby councils we do collect
- Edinburgh 1142 in 90 days
- Argyll and Bute 292 in 90 days
- Glasgow 238 in 90 days
- Perth and Kinross 230 in 90 days
- Dumfries and Galloway 216 in 90 days
- Aberdeenshire 172 in 90 days
- Fife 120 in 90 days
- Moray 107 in 90 days
Get Shetland Islands leads
A free account searches every council we cover and posts a letter for £1.45. £39 a month puts the applicants' names and addresses in front of you with 30 letters included, then £1.20 each.